Eeloo-Class Vehicle Cargo Ship

From Kerbal Powers Wiki
Revision as of 02:47, 10 December 2024 by Zekes (talk | contribs) (Created page with " {{Craft |name = |full_name = |image = ZokeScreenshot20591.png|imagedesc = ZSNS Eeloo (T-AKR-340) |type=Ship |role=Vehicle Carrier |origin=Zokesia |design_start=2185|design_end= |prod_start=2196|prod_end=ongoing |designer=Freetowne Shipyards |cost=485,000 |built=2 |serv_start=2198|serv_end=ongoing |operators=The Confederacy<br/>Confederate Navy {{Craft/Naval Vessel |mass=5000 Tons |length=210 |width= 33 |height=52 |draft= 8 |propulsio...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Eeloo-Class Vehicle Cargo Ship

Ship
ZokeScreenshot20591.png
ZSNS Eeloo (T-AKR-340)
Role Vehicle Carrier
National Origin Zokesia
Production History
Produced
2196 - ongoing
Designer Freetowne Shipyards
Unit Cost 485,000(√)
Number Built 2
Service History
In Service
2198 - ongoing
Used By The Confederacy
Confederate Navy
Vessel Characteristics
Displacement 5000 Tons
Length 210 m
Beam 33 m
Height 52 m
Draft 8 m

Propulsion x4 FROSTON Electro Propulsion
Max Speed 29 kn (14.5 m/s)
Operational Range 6800 km

Complement 450 (30 officers, 420 enlisted)
Sensors and Processing Systems FROSTON CRYSTAL Block II
SIMPSON Radar System
Armament x2 Phalanx CIWS
x1 Mk-49 SEARAM
Boats Carried x4 25ft Swiftboat

The Eeloo-class vehicle cargo ship, also known as Fast Sealift Ship (FSS) or ZL-7, is a class of Vehicle Carrier in service in the Confederate Navy. Originally built in 2172 and 2173 as high-speed container ships known as ZL-7s for Cyten-Ward, the ships' high operating costs limited their profitability. Both ships were acquired by the Confederate Navy in 2198 and 2199, with the last ship converted, delivered to and placed in service with Military Sealift Command in 2200. The conversion entailed the installation of four cranes, addition of roll on/roll off capability and a redesign of the cargo hold to better facilitate storage of vehicles. Due largely to their high cost of operation, all fast sealift ships are kept in Reduced Operating Status, but can be activated and ready to sail in 96 hours. All ships are named after planets.

Development

Design

Further Development

Foreign Sales

ZSNS Duna (T-AKR-341) unloading ashore