Arx Class Destroyer: Difference between revisions

From Kerbal Powers Wiki
Jump to navigation Jump to search
m (Text replacement - "{{Naval_vehicles_(military)" to "{{Craft")
m (MiffedStarfish moved page MHC-11 Arx to Arx Class Destroyer without leaving a redirect)
 
(3 intermediate revisions by one other user not shown)
Line 1: Line 1:
 
== MHC-11 Arx ==
 
== MHC-11 Arx ==
{{Craft|title1 = MHC-11 Arx|image1 = 84F70F9C-D1A7-4754-AF54-635BFBA27E60.png|caption1 = An MHC-11 Arx prototype undergoing testing and evaluation|operators = Aquarian Navy|produced = 3|designation = MHC-11 Arx Heavy Cruiser|mass = Placeholder|length = 37m|propulsion = 3 J-90 “Goliath” Turbofan Engines (Reversible)|speed = 25.2m/s|armamemt = Too much|complement = 24}}The MHC-11 Arx is a heavy cruiser designed to perform tasks that require more range and firepower than a Castellum can deliver. Currently three are in production, expected to arrive over the course of late 2056 and early 2057.
+
{{Craft|title =MHC-11 Arx|image =84F70F9C-D1A7-4754-AF54-635BFBA27E60.png|caption1 = An MHC-11 Arx prototype undergoing testing and evaluation|operators = Aquarian Navy|produced = 3|designation = MHC-11 Arx Heavy Cruiser|mass = Placeholder|length = 37m|propulsion = 3 J-90 “Goliath” Turbofan Engines (Reversible)|speed = 25.2m/s|armamemt = Too much|complement = 24}}{{Draft}}The MHC-11 Arx is a heavy cruiser designed to perform tasks that require more range and firepower than a Castellum can deliver. Currently three are in production, expected to arrive over the course of late 2056 and early 2057.
 
[[Category:Naval Craft]]
 
[[Category:Naval Craft]]

Latest revision as of 23:43, 9 June 2024

MHC-11 Arx

Arx Class Destroyer

84F70F9C-D1A7-4754-AF54-635BFBA27E60.png
National Origin {{{origin}}}
Production History
Service History
Used By Aquarian Navy
This page is a draft and is still being written. You can help by completing it.

The MHC-11 Arx is a heavy cruiser designed to perform tasks that require more range and firepower than a Castellum can deliver. Currently three are in production, expected to arrive over the course of late 2056 and early 2057.